We operate end-to-end, from research through manufacturing, to deliver SolidFlow battery systems at scale. CMBLU is home to Europe’s largest non-lithium battery energy storage laboratory.
Global Reach
Scaling globally, we are building energy storage infrastructure to support more than 10 GWh across on- and off-grid applications by 2029.
Status:
Live since 2024
Current capacity:
1 GWh
Max output:
4 GWh
Status:
Planning
Production begins:
2029
Max output:
4 GWh
Status:
Under construction
Production begins:
2027
Max output:
4 GWh

Our Gigafactory in Alzenau

Our headquarters is an operational gigafactory site in Alzenau with an output capacity of 1 GWh ready for commercialization. We do everything from designing the right chemical mixtures to assembling the final modules on-site.

Our headquarters is an operational gigafactory site in Alzenau with an output capacity of 1 GWh ready for commercialization. We do everything from designing the right chemical mixtures to assembling the final modules on-site.

Our headquarters is an operational gigafactory site in Alzenau with an output capacity of 1 GWh ready for commercialization. We do everything from designing the right chemical mixtures to assembling the final modules on-site.

Our headquarters is an operational gigafactory site in Alzenau with an output capacity of 1 GWh ready for commercialization. We do everything from designing the right chemical mixtures to assembling the final modules on-site.

An operational gigafactory in Alzenau, Germany, that delivers 1 GWh of capacity, ready for commercialization. Fully integrated, from materials development through final assembly, all on-site.